In many cases, the contractor will simply guess at the locations, and fulfill the as-built document requirement, after the fact. Unfortunately in many projects the as-built documents are not recorded accurately and timely. These dimensions and measurements, will then be stored for the record, and used to find buried piping, under slab conduits or piping, or anything within the project that is not clearly viewed and exposed. Theoretically, at the end of the project, all the final dimensions relating to the actual installed items, that make up the total project, will have been recorded on the as-built documents. As items are installed, measurements are taken and recorded on the as-built documents for the project. During the course of any ongoing construction project, a set of as – built documents is kept in the construction office, or in the lead super’s truck. As – built, represents exactly what it states, the as-built dimensions and elevations of a project, whether it has been just constructed, or is an existing, long established project. An as-built document of an existing structure, if available, can be provided to a contractor, to ensure an understanding of the final dimensions, etc. Definition: What Does the Term “As – Built” Mean?Īn as – built document, is the end result of a new installation or renovation.
0 Comments
Leave a Reply. |